Prefabricated plants or plant parts for the Oil & Gas market and the market for Energy, the production capacity in excess of 300,000 man hours in the workshop. The factory covers an area of 25,000 square meters, the workshops are equipped with all the machine tools necessary for this type of prefabrication, including a High Definition laser cut to $, a submerged arc welding to NDT, a drill boring machine moving column machining for up to 12 meters in CND, the machines to perform the heat treatment of the piping.